Ruby Pipeline | |
---|---|
Location | |
Country | United States |
General direction | east-west |
From | Opal, Wyoming |
Passes through | Wyoming, Utah, Nevada, Oregon |
To | Malin, Oregon |
General information | |
Type | natural gas |
Partners | El Paso Corporation |
Operator | Ruby Pipeline, L.L.C. |
Commissioned | 2010 |
Technical information | |
Length | 680 mi (1,090 km) |
Maximum discharge | 1.5 billion cubic feet per day (15 billion cubic metres per year) |
Diameter | 42 in (1,067 mm) |
The Ruby Pipeline is a 42-inch (1,100 mm) natural gas pipeline running from Opal, Wyoming, to Malin, Oregon. The route crosses Northern Utah, and Northern Nevada.[1] Ruby Pipeline, L.L.C. filed an application with the Federal Energy Regulatory Commission (FERC) on January 27, 2009, authorizing the construction and operation of the Ruby Pipeline Project. On April 5, 2010, the FERC approved the application. Construction began on July 31, 2010, and the pipeline was placed in service on July 28, 2011. The pipe is 680 miles (1,090 km) long and is expected to output 1.5 billion cubic feet per day (42×10 6 m3/d).
There is concern that the project crosses more than 1000 rivers and streams, and threatens some endangered fish species.[2]
The Summit Lake Paiute Tribe of Nevada petitioned the Ninth Circuit Court of Appeals for an emergency action blocking the pipeline. [3]